20 January 2014 – Allures boatyard in Cherbourg, France
![aventura4-140120-1A](/wp-content/uploads/2014/01/aventura4-140120-1A.jpg)
Work on finishing the interior of Aventura IV is proceeding apace at the Allures boatyard in Cherbourg, France
![aventura4-140120-1B](/wp-content/uploads/2014/01/aventura4-140120-1B.jpg)
The rudders are in place but more work needs to be done to strengthen them for possible encounters with ice
![aventura4-140120-2](/wp-content/uploads/2014/01/aventura4-140120-2.jpg)
Jimmy Cornell with Erick Bouteleux, Ivan Cornell and Nick Carter as work on Aventura IV enters final stage
![aventura4-140120-3](/wp-content/uploads/2014/01/aventura4-140120-3.jpg)
A lot more than just a tin can.
![aventura4-140120-4](/wp-content/uploads/2014/01/aventura4-140120-42.jpg)
Laying the Dek-King
![aventura4-140120-5](/wp-content/uploads/2014/01/aventura4-140120-5.jpg)
Cork Dek-King covering for the cockpit seats as well as the side decks
![aventura4-140120-6](/wp-content/uploads/2014/01/aventura4-140120-6.jpg)
Preparing the fully insulated floors
![aventura4-140120-7](/wp-content/uploads/2014/01/aventura4-140120-7.jpg)
Fitting the forward cabin floor
See also: